Sthenos Advanced S and C program dashboard, version 2. Active quarter, the 36 week year, the 12 week loading ramp for primary and secondary lifts, session templates with step-back versions, the accessory pool, the test protocol, and the coach card.

Sthenos · Advanced S&C · v2

The training program

Three 12-week quarters. Each one runs a primary lift and a secondary lift through hypertrophy, strength, and power, then a test week and a deload.

Active quarter
Primary lift
Secondary lift
This week

Where we are now

Always current

The year

36 weeks

Bench is in every quarter, as the star once and as the support twice. Squat and deadlift never share a quarter.

The weekly ramp

Established clients read the % column. Clients in their first cycle read the RPE column instead. The percentage starts the bar, the RPE cap stops it.

Session templates

Every slot has a standard version and a step-back version. The lifter picks which one they run at the door.

Accessory pool

2 per session, max

One from pool A matched to the day's main lift, one from the pattern opposite it. Built only from kit we actually own.

Test protocol

Week 11

Primary lift tested first, secondary second. Split the group across two nights per lift, six lifters a night.

Coach card